-*- Home     1      2     3     4     5     6     7     8     9   



Boating

Cribblog 2018


   Afloat again. 21 November 2018.

I was thinking as I drove down to Aldermaston how nice it would be to arrive to find that all the outstanding jobs had been completed and cribbit would be ready to sail away into the sunset.

One good sign on arrival was that they had cleared the car park and that there was a big lorry in the process of being loaded with a narrow boat.

I walked round the back to see how things were with Cribbit but was dismayed to find that the boat next door had still not been blacked and access for the crane looked rather difficult. Cribbs looked much as usual but that canada geese had obviously liked squatting on my nice new floorboards which were now liberally besmirched with their slimy guano, then I looked up and lo and behold there was a new chimney stack! Tom had installed the bew boiler.



2823
Overplating finished but no sign of its bottom being blacked.

2824
I looked up and lo and behold there was a new chimney stack!

12825
All ready for Santa and his reindeer and ... the seven dwarfs and ....

2828.JPG
Crane manoervered into positoion.

2830

2831

2832.JPG

2834

2835.JPG
Nice to see those brand new lifting bands in use.

2837.JPG
Just a small lift to weigh her and to see if the overload alarm would trip ... it did.

2838.JPG

2839.JPG

2840.JPG
Just clear.

2841.JPG
Now swing her gently round.

2842.JPG

2843.JPG

2844.JPG

2845.JPG

2846.JPG

2848.JPG
Needs to go out a bit further ... will have to suffer the alarm.

2851.JPG

2852.JPG

2853.JPG
Lean hard and she'll [just] go in.

2854.JPG
Phew!

2855.JPG
Now check that the new welding isn't leaking.

2856.JPG
All's well ... float her off to be with the others for the final jobs.

2857.JPG

2858.JPG
Next up Amadeus last seen with Jim at Monkey Marsh Lock on our way here, over a year ago.



Website links

Topics